Bathroom refreshSomerville, MA

A dated bathroom made modern and brand-new — in days, not weeks

See the result
Timeline3 days
ScopeBathroom refresh · Vanity & tile refresh · Fixtures & paint
FinishVanity refinished in bone white 2K poly, refreshed tile, matte black fixtures, semi-gloss walls
Investment$7,400Bathroom refresh — vanity and tile refresh, fixtures, and paint
LocationSomerville, MA

What they needed

The challenge

Nick wanted his bathroom to feel modern and brand new — but didn't want to gut it to the studs to get there. The challenge was achieving a dramatic before-and-after through a fast, contained refresh in a Somerville apartment, with finish quality high enough that the result reads as a full renovation.

Dated bathroom in a Somerville apartment before the refresh
Before

Our process — in practice

How we did it

The same five-stage process, applied to this project.

01

Video walkthrough

A 20-minute video walkthrough set the full refresh scope — what to refinish, which fixtures to swap, and the tile and paint direction — with a written, same-day quote. Nick knew exactly what he was getting before day one.

02

Prep & containment

All work was contained within the bathroom — no dust or debris reached the living space or hallway, and no demo dumpster on site. A refresh keeps building disruption to a minimum.

03

Surface prep & repair

Every surface being refinished was hand-sanded to a clean base before any finish went on. This prep is what separates a refresh that lasts from a quick coat that peels within a year.

04

Finish & installation

The vanity was refinished in 2K polyurethane, the tile refreshed, matte black fixtures installed, and the walls repainted in semi-gloss — a coordinated finish that reads as a full renovation.

05

Cure & walkthrough

On the final day, every refinished surface, fixture, and tile line was inspected with Nick before sign-off, with touch-ups handled on the spot. The hallway and elevator were checked clean before departure.

The transformation

Before & after

Dated bathroom in a Somerville apartment before the refresh
Refreshed modern bathroom — refinished vanity, refreshed tile, and matte black fixtures
Nick C. · Somerville, MA — drag to compare

The result

A dated bathroom transformed into a modern, brand-new space — through a contained refresh finished in 3 days.
$7,400Bathroom refresh — vanity and tile refresh, fixtures, and paint

Jerry completely transformed our bathroom into a modern, functional space that feels brand new. His communication, professionalism, and attention to detail were exceptional throughout the project. The finished result exceeded our expectations, and we couldn't be happier with the outcome.

Nick C.

Nick C.

Bathroom refresh · Somerville, MA

Returning client

Free video estimate in Somerville

Ready for the same quality in Somerville? Get a written quote today.

Get my free estimate
Get my free estimate